Project identifier

GINOP-2.1.7-15-2016-01380

Project title

Development of an integrated information system to support and control production in the furniture industry

Support

105 840 000 Ft

Support intesity

60%

Date of completion

2019.12.31

Introduction of project content

The IFPS is a new, unprecedented, highly complex system that can cover the entire furniture manufacturing process, and is thus able to provide highly complex and practical decision support and forecasting services based on the amount of information in the entire process. You can download the source code of the Integrated Furniture Production Support and Control System (IFPS) free of charge by clicking on the link below. We would like to draw your attention to the fact that adapting the IFPS system to local conditions and filling it with data is absolutely necessary for the system to work.

Szechenyi + LogoSzechenyi 2020 Logo